Commercial & industrial · Indianapolis area

ESD flooring starts with the facility requirement

Static-dissipative and conductive flooring can be appropriate for some electronics, manufacturing, laboratory, and technical environments. The specification, grounding plan, and maintenance expectations need to be confirmed before a system is selected.

Commercial intent

What we can help you clarify

Requirement

Start with the equipment, process, ESD control plan, and any specification supplied by the facility or equipment vendor.

System selection

Conductive and dissipative systems are not interchangeable. Selection depends on the target performance, substrate, grounding, and environment.

Installation plan

Review prep, moisture, grounding details, access, cure time, testing, and maintenance before scheduling the work.

Scope note: This page explains the commercial conversation. Any ESD installation, performance target, or certification-related claim must be confirmed for the specific facility before publication or quoting.
Before you request a quote

Bring the details that change the system

  • Facility type and the area requiring static control
  • Equipment, process, or customer specification
  • Existing floor coating, concrete condition, and moisture history
  • Grounding requirements and who owns testing or certification
  • Approximate square footage, access limits, and desired timeline

If you do not know which system you need, say so. A good first conversation identifies the requirement before anyone recommends a product.

Marked industrial floor area used for facility traffic planning
Learn before you specify

ESD resources for facility teams

Static-dissipative explained

Understand the difference between conductive and dissipative flooring, who usually needs it, and why grounding matters.

Read the informational guide →

Industrial flooring overview

Compare preparation, traffic, exposure, downtime, and application considerations across industrial spaces.

Explore industrial flooring →

Talk through the project

Share your facility conditions and requirements so the scope can be checked before a quote is prepared.

Start a project brief →
Questions

ESD flooring FAQs

Is ESD flooring the same as ordinary epoxy?

No. ESD systems include conductive or dissipative components and grounding details that ordinary decorative or heavy-duty epoxy may not provide.

Do all manufacturing facilities need ESD flooring?

No. The need depends on the process, equipment, materials, and facility requirements. Confirm the requirement instead of treating ESD as a default upgrade.

Can you quote an ESD floor from photos alone?

Photos help with an initial conversation, but a reliable scope also needs facility details, substrate information, access, and the target performance requirement.